ThermoFormed Solid Walls
(Page 2 of 6)

Picture of solid-wall-10-4-02
Previous 1  2  3  4  5  6  Next

For full-basement installation, the floor ledger
may be installed prior to placement of concrete.
Scaffold system is straightforward: use a gussetted
vertical member with kicker every eight feet.

Return to Home Page